Remedial work at filling stations throughout HungaryThe failure of the old technical systems had resulted in contamination of soil and groundwater.
|
| Project description |
Especially impacted were the surroundings of offset filling cabinets, the fuel pumps, the underground storage tanks, and the waste oil collection areas.
Remediation Technologies:
Groundwater dual pumping system, skimming, air stripping, activated carbon adsorption
Soil excavation, soil gas extraction, air sparging, biosparging, in-situ soil bioremediation, bioventilation
Project Status: 30 Gas stations completed
Contaminants: Diesel oil
Client: Several oil companies
Project Manager: Lajos Kudron
Date of Operation: 1992-2000