Investigation and Remediation of a gasoline station

After the soil and groundwater investigation remediation was planned with partial excavation and in-situ measures with soil vapour extraction.

Investigation and Remediation of a gasoline station
After the soil and groundwater investigation remediation was planned with partial excavation and in-situ measures with soil vapour extraction.

Installation of pipes for soil vapour extraction (DN 100)

  Project description


A contamination of volatile hydrocarbons was found in the unsaturated soil zone during construction works at this gasoline station. In the first step the center of contamination was excavated under the supervision of Intergeo. To speed up the working process on site, 2 layers of horizontal perforated pipes were installed and connected to 4 soil vapour extraction units with activated carbon filters. The remediation was finished successfully In the following 12 months and in accordance with the local authorities.

Client: Oil industry

Location: Gasoline station Austria
Contaminated area: 250 m² to a depth of 4.5m between the gasoline pumps

Date of operation: 10/2000 – 12/2001

Kinds of technologies used: Local excavation, soil vapour extraction

Max. concentration of contaminant at beginning of remediation: 5400 mg/kg and leachate 18mg/l hydrocarbons

Clean up goals: According to Austrian standards

( <<-- back one chapter )
Remediation

Remediation of soil and groundwater. INTERGEO’ s environmental engineers and scientists have completed more than 2000 soil and groundwater remediation projects in Europe and overseas.( <-- back one page )
Final closing of an industrial dump site (chemical industry)

After executing a site assessment with soil and groundwater investigation and analysis, carbonate-sludge with PVC-parts, PVC-sludge and building debris was detected on the dumpsite.( Index )
Remediation

Remediation of soil and groundwater. INTERGEO’ s environmental engineers and scientists have completed more than 2000 soil and groundwater remediation projects in Europe and overseas.( next page --> )
Gasoline station with a contamination of volatile hydrocarbons

Due to construction work at this gasoline station a contamination of volatile hydrocarbons was found in the unsaturated soil zone.( next chapter --> )
Analyses

Environmental laboratory and analyses with mobile laboratory bus.German version
Altlastenerkundung und Sanierung einer Tankstelle
 Intergeo Consulting   
 Impressum   
 News   
 Languages   
 Branch offices   
 References   
 Consulting   
 Site investigation   
 Remediation   
 Analyses   
 Applications   
 Technologies   
 Pollutants   
 Water Technology   
 Seawater desalination   
 Remediation 
 References 1-10 
 References 11-20 
 References 21-20 
 Car station 
 Fuel tank site 
 Oil spill 
 Landfill 
 Pharmaceutics 
 Insulating company 
 Filling station 
 Gas motor mill 
 Railways 
 Railway brakeyard 
 Military area 
 Industrial site 
 EC program 
 Fertilizer facility